New Build Portal Frame
Airdrie, Scotland
Overview
Working for a local building contractor JBD Tritec were employed to manufacture and install a portal frame structure to be used as a storage warehouse. The structure and associated cladding supports were fully detailed, supplied and fitted on site on time and within budget.
Project Specifics
- Detailed approved drawings and connection calculations.
- 9 tons of fabricated hot rolled steelwork.
- 2 tons of Kinspan Multibeam cold rolled steelwork.
- Fully installed, lined and levelled and handed over to client.
- Project duration - 2 weeks.